Powertech has successfully completed further works for Woodside as described below on T03AC2 20MW Transformer 33kV6.6kV at Pluto LNG Park after a fault on the HV infrastructure.
– Insulation Resistance
– VLF/ Tan Delta
– Partial Discharge
– Replace all 33kV termination kits and inspect the gland plates
– Sweep frequency response analysis
– Oil analysis
– Cable fault Location
– DFR
Powertech has been working for Woodside for over 18 years and has built up a team of experts that know the client’s plant very well and is able to assist and collaborate when required.